January 4, 2022
Lake Hampton MFL Workshop and Document Review
A workshop for the Lake Hampton Minimum Flows and Levels (MFLs) has been scheduled. See the links provided and information below.
The Lake Hampton MFL technical documents are posted to the District’s website for review.
Public comment is being accepted on MFL methods and analyses presented in the technical report, modeling report, and status assessment memo until February 9, 2022. Please email all comments to MFL@srwmd.org.
A public workshop for the Lake Hampton MFLs is being held on January 12 at 6pm in Hampton, FL.
Access the links below for more information.